Website Problems!
Hello everyone,
Well I can not upload new pictures to our website due to a huge server failure at the hosting company. As soon as the site is back online, I will be posting an update on our progress with pictures. Our current status is:
- waiting for the log beams to be installed in the vaulted ceiling.
- waiting for the countertop manufacturer to make the necessary measurements for the kitchen cabinets.
- the cabinets for the utility and bathroom have been measured and the countertops for them are in work.
- waiting for delivery of the porcelain tile so it can be installed.
- the red aromatic cedar is now on site for all of the trim but has to be planned and edged before cutting to size and installing.
- sanding and clear coating of the cabinets has been started but will take quite some time.